— Semiconductor Industry

Ultra-high-purity vacuum for chip fabrication

Wafer handling, cleanroom automation, and chip fabrication chambers all demand vacuum environments with zero tolerance for hydrocarbon contamination a single trace can compromise an entire wafer lot.

— Application Scenarios

Where scroll vacuum technology fits into semiconductor fabrication

Dry scroll pumps back the chambers where contamination isn’t just costly, it’s yield-defining.

01

Wafer Handling

Clean backing vacuum for wafer transfer and load-lock chambers.

02

Cleanroom Automation

Reliable, low-particulate vacuum for robotic cleanroom tool automation.

03

Chip Fabrication Chambers

Ultra-high-purity backing vacuum for etch, deposition, and lithography chambers.

— Our Core Advantages

Built around what semiconductor fabrication actually needs

100% Oil-Free

Zero hydrocarbon contamination in the vacuum path, by design.

Low Noise & Vibration

Quiet, stable operation even in close proximity to sensitive equipment.

Low Maintenance

Field-replaceable tip seals mean minutes of downtime, not a factory return.

Reliable Performance

Consistent ultimate pressure over years of continuous operation.

— Tailored Product Portfolio

Recommended for semiconductor industry applications

Intelligent Series

GWSPB

Reliable backing pump for standalone LED and display process tools.

Ultrahigh Vacuum

GWMS

Integrated backing solution built for ultra-high-purity fab chamber requirements.

Standard Series

GWSP

Compact backing pump for standalone tools and R&D fab lines.

Need technical drawings, CAD files, or compliance certificates for integration?

Everything you need to spec a GeoWell pump into your device design is in one place.

— Partners & Collaborations

Integrated into instrument platforms worldwide

GeoWell works directly with analytical instrument manufacturers as an OEM backing-pump partner from off-the-shelf integration to custom engineering.

— Get Started

Talk to us about your instrument's vacuum requirements

Send us your pumping speed, ultimate pressure, and integration constraints our engineers will recommend a configuration within one business day.
Scroll to Top
Access Technical Documents

Download Test Report

Please complete the form below to access this test report. This information helps us provide better technical support and understand your application requirements.